
A | PORTLAND, Ore. -- Federal regulators on Thursday approved the expansion of a natural gas pipeline in the Pacific Northwest over the protest of environmental groups and top officials in West Coast states, who said it goes against the region’s plans to address climate change and could pose a wildfire risk.The project, known as GTN Xpress, aims to expand the capacity of the Gas Transmission Northwest pipeline, which runs through Idaho, Washington and Oregon, by about 150 million cubic feet (4.2 million cubic meters) of natural gas per day. The Federal Energy Regulatory Commission gave it the green light in a vote on Thursday.TC Energy plans to modify three compressor stations along the pipeline — in Kootenai County, Idaho; Walla Walla County, Washington; and Sherman County, Oregon. Compressor stations help maintain the pressure and flow of gas over long distances in a pipeline. Environmental groups criticized the decision of the commission, which "failed to listen to Senators, Governors, State Attorneys General, Tribes, and the public in its rubber stamp of unnecessary fracked gas in the Northwest,” said Audrey Leonard, staff attorney for Columbia Riverkeeper, an environmental nonprofit, in a statement.Leonard said potential spills and explosions on the pipeline, which was built in the 1960s, would not only harm the environment but also present a heightened wildfire risk in the arid regions it passes through.“An explosion of that level in eastern Washington or eastern Oregon would be catastrophic,” she said.Leonard said Columbia Riverkeeper will appeal the federal regulators’ decision and submit a petition for a rehearing. The pipeline belongs to TC Energy of Calgary, Canada — the same company behind the now-abandoned Keystone XL crude oil pipeline. The company said the project is necessary to meet consumer demand.Environmentalists and officials opposed to the project have expressed concern about TC Energy’s safety record. Its Columbia Gas Transmission pipeline exploded in Strasburg, Virginia, in July and its existing Keystone pipeline spilled nearly 600,000 gallons of bitumen oil in Kansas last December.The 1,377-mile (2,216-kilometer) pipeline runs from the Canadian border through a corner of Idaho and into Washington state and Oregon, connecting with a pipeline going into California.While Idaho’s Republican governor and congress members said that imposing other states’ climate policies would be “misguided,” Democratic officials in the other states called on federal officials to reject the plan. After the vote, Washington Gov. Jay Inslee, a Democrat, condemned the decision.The project is “incompatible with our climate laws,” said a letter to the agency by Democratic U.S. Senators Ron Wyden and Jeff Merkley of Oregon and Patty Murray and Maria Cantwell of Washington.“GTN Xpress represents a significant expansion of methane gas infrastructure at a time when California, Oregon, and Washington are moving away from fossil fuels,” the senators said.The attorneys general of the three states, citing the commission's draft environmental impact statement for the project, said it would result in more than 3.47 million metric tons of greenhouse gas emissions per year for at least the next three decades. The agency’s final environmental assessment revised that number downward by roughly half in calculations contested by environmental groups.The agency’s chairman, Willie Phillips, reiterated its stance after Thursday’s vote.“There was no evidence presented that this project would significantly increase greenhouse gas emissions,” he told reporters. “The commission determined that this project was needed and therefore we support its approval.”In its final environmental impact statement for the project issued last November, the federal agency said the compressor stations were in non-forested areas with low to moderate fire hazard. It concluded the project “would result in limited adverse impacts on the environment.”“Most adverse environmental impacts would be temporary or short-term,” the federal agency said. The agency recommended certain steps, such as requiring the company to train its personnel and contractors on environmental mitigation measures before any construction begins. But environmental groups say the assessment didn’t adequately address the harm caused by the project, including by fracking to obtain the natural gas that flows through the pipeline. Fracking is a technique used by the energy industry to extract oil and gas from rock by injecting high-pressure mixtures of water, sand or gravel and chemicals. It has been criticized by climate and environment groups for increasing emissions of methane, an extraordinarily potent greenhouse gas. ___Claire Rush is a corps member for the Associated Press/Report for America Statehouse News Initiative. Report for America is a nonprofit national service program that places journalists in local newsrooms to report on undercovered issues.。 每经记者:杨建 每经编辑:肖芮冬 |2026年7月22日 星期三| NO.1 NTN卫星通信先锋行动正式启动 据中国信通院公众号,近期,在工业和信息化部信息通信管理局指导下,中国信息通信研究院联合产业链上中下游多家核心单位共同启动NTN卫星通信先锋行动。NTN卫星通信先锋行动将搭建天地融合的卫星通信仿真、测试与中试一体化验证平台,结合中国信通院在技术仿真、测试验证等方面的研究积累与技术能力,联合业界攻克基于NTN的天地融合关键技术,开展端到端技术试验与测试验证,集成涵盖仿真模拟、性能检测、可靠性评估的三大核心能力,打造从“数字仿真”到“实物测试”再到“在轨验证”的全生命周期闭环。 NO.2 国内首款硬膜下植入式柔性脑机接口进入“绿色通道” 脑虎科技宣布,其自主研发的“植入式脑机接口手部运动功能代偿系统”通过公示,正式进入国家药品监督管理局医疗器械技术审评中心(CMDE)的创新医疗器械特别审查程序。这是国内首个进入该“绿色通道”的硬膜下植入式柔性脑机接口产品。今年6月,国家药监局发布相关文件,明确侵入式/植入式脑机接口统一按最高规格的“第三类医疗器械”管理。创新医疗器械特别审查程序则旨在鼓励医疗器械研究与创新、促进新技术推广应用。 NO.3 《深化互联网协议第六版(IPv6)技术创新和融合应用实施方案(2026—2030年)》发布 7月21日,中央网络安全和信息化委员会印发《深化互联网协议第六版(IPv6)技术创新和融合应用实施方案(2026—2030年)》,到2027年,IPv6端到端贯通水平全面提升,技术创新和融合应用取得重要阶段性成果。IPv6活跃用户数达9亿,IPv6网络流量占比达38%。到2030年,IPv6与经济社会各行业各领域广泛深度融合,构建技术先进、开放创新、内生自驱、安全可靠的IPv6产业生态。IPv6活跃用户数达9.5亿,IPv6网络流量占比达42%。新增网络默认优先提供IPv6地址,加快向IPv6单栈演进,推动形成以IPv6为主导的网络服务和应用体系。 NO.4 水利部:到2035年基本形成完备的水利遥感卫星应用体系 水利部日前印发《水利遥感卫星应用发展总体方案(2026—2035年)》,将通过统筹推进水利遥感卫星资源、数据资源、业务应用、技术创新和技术标准四大体系建设,有效扩充卫星资源。

B | 到2030年,初步形成覆盖主要业务领域的水利遥感卫星应用体系;到2035年,基本形成完备的水利遥感卫星应用体系,亚米级分辨率影像覆盖能力大幅提升,进一步提高重大水利应急事件快速监测能力。 NO.5 智谱AI落地1GW国产算力中心,同步完成对中科加禾的收购 7月21日,智谱AI(Z.ai)已落地1GW级国产AI算力数据中心建设,并全部采用国产AI芯片。与此同时,智谱也于今日正式完成对国产AI异构算力软件公司中科加禾(XCore Sigma)的收购。

C | 后者源自中国科学院计算所编译实验室,长期深耕异构算力软件栈及编译优化,被业内视为国内顶尖AI Infra团队之一。

D | 前者提供大规模模型训练所需的计算资源,后者则通过编译器、Runtime、推理引擎等基础软件能力,提高异构芯片利用率,降低推理成本,并提升模型部署效率。

E | NO.6 三星电子扩大与英伟达NAND供应合作,加速V9、V10闪存布局 7月21日,三星电子正扩大与英伟达在NAND闪存领域的合作,在此前已开展DRAM、高带宽内存(HBM)及晶圆代工合作的基础上,进一步深化存储芯片供应关系。

F | 据报道,三星已开始量产第十代V-NAND(V10)并向英伟达供货,同时扩大第九代V-NAND(V9)产能,并推进第十一代500层级V-NAND(V11)开发。据悉,三星目前已具备月产超过10万片V-NAND的产能,其中约60%产能分配给V9产品。 NO.7 氮化镓纳米晶体首次制成 7月21日,美国芝加哥大学与阿贡国家实验室的化学家在最新一期《自然》杂志上发表研究报告,他们首次利用金属氮化物氮化镓制造出纳米晶体,为电子器件、柔性照明和医疗植入物等领域提供了新材料。 NO.8 可编程光子集成电路实现光信号实时调控 7月21日,传播速度快是光计算的优势,但有时也成为实现信号处理功能的难题。韩国首尔大学与首尔市立大学联合研究团队开发出一种可编程光子集成电路,可根据需求调控光信号传播速度,让其“慢下来”,同时实现对光信号传输特性的实时调控。

G | 这突破了传统光学延迟结构难以灵活调控的限制,有望推动下一代AI计算、光通信和数据中心向更高速、更低功耗方向发展。相关论文发表于最新一期《先进科学》杂志。 NO.9 马斯克称将超越Kimi 月之暗面:欢迎一起掰一掰手腕 7月21日,在位于北京海淀区的月之暗面办公区,最近因新模型火爆全球的北京大模型企业月之暗面相关负责人向记者现场回应马斯克“可能超越Kimi”的言论:“我们拭目以待,欢迎大家一起掰一掰手腕。他有信心,我们有更强的信心。

H | ” NO.10 我国西南新增规模化氢源基地 7月21日,据中集集团透露,位于贵州省六盘水市的钢焦一体化清洁能源项目日前正式投产并实现稳定运营,成为“渝黔桂”氢走廊上关键的氢源补给节点。此次投产的项目是目前西南地区规模领先的工业尾气制氢、资源化利用示范项目。这个项目依托本地钢铁产业富余焦炉煤气资源,采用自主研发的全链条工艺技术完成组分拆分,将原本用于燃烧发电的工业尾气转化为高值清洁能源,可年产99.999%燃料电池级高纯氢气2400万立方米、液化天然气约14万吨,实现资源就地高效转化。 免责声明:本文内容与数据仅供参考,不构成投资建议,据此操作,风险自担。

I | 每日经济新闻。
Current article:http://hkk8ej.shuacanrandenmizhuohaoeiliang.buzz/list_2uctl/whr6.html
Published on:19:53:33
泡泡玛特业绩出炉,段永平回怼网友恶评:该吃药了吧?
穆赫兰道
海格通信:上半年归母净利润亏损1.81亿元,由盈转亏
会痛的十七岁
原创 【浮生琐记】程秉铎 || 云峰山秋游记
勇者义彦与魔王城
行业调整期,雅迪用行业引领者与出海加速度交出中期答卷
钱塘老娘舅
班凯罗谈附加赛不敌76人:我心态犹豫致发挥失常
辛普森一家
安徽省委网信办:健全涉诈信息预警和快速处置机制
圆月弯刀